Beware of city fiber present in ROWs. It will be located when locate requests are entered through the Iowa One Call system. We do not permit any splicing of this cable. Any damage caused will result in complete cable replacement from termination point to termination point at the cost of the negligent ROW user and/or any subcontractors working under this permit.
The City of Ames Public Works Department carefully manages its right-of-ways. The Engineering Division utilizes an online application named ROWay. This online system is designed to streamline the Right-of-Way permit application and approval process by allowing users to:
There is currently no fee associated with the ROWay permit process.
The installation of small/micro cell wireless facilities within the City ROW requires approval of a separate permit in addition to the standard ROW permit described above:
Below is a list of standard practices and regulations that apply to all work that is performed within the ROW:
In addition to the standards listed above, the following construction guidelines also apply:
Working in the ROW without an approved permit, or failure to comply with the above requirements, may result in the refusal of future permits and a Municipal Infraction with an associated fine of $500.00 or more for each violation.
Temporary Obstruction Permits