Set out your garbage can as usual. The contractor will move cans to a designated pickup location for collection. To ensure your can is returned to the correct address, please tape your address to it. Residents with landscaping in the right-of-way should remove any plants/objects, as they may be damaged or removed during construction. Green areas will be restored on project completion.
The City of Ames has contracted with All Star Concrete for the reconstruction and rehabilitation of Hyland Avenue. The project will include three stages of full PCC pavement replacement from Ontario Street to Pammel Drive, as well as patching and rehabilitation at select locations between Pammel Drive and Lincoln Way. Hyland Avenue from Oakland Street to Lincoln Way will undergo rehabilitation improvements. This will include full-depth PCC patching of deteriorated sections, as well as crack cleaning and sealing. As part of the project, the existing bike lanes on Hyland Avenue from Ontario Street to Oakland Street will be removed from the roadway and relocated to a new shared use path along the west side of Hyland Avenue.
42.034406124847685, -93.65568148653787, View Map
Project Engineer Dean Sayre 515-239-5277
Project Inspector Jesus Campa 515-203-0797
Hyland Ave Bike Detour Route Map(PDF, 11MB)
Stage 1 Detour Map Hyland Ave(PDF, 1MB)
Hyland Ave Patching Map(PDF, 853KB)