Post-Construction Stormwater Management

Stormwater Pond with Water

INTERIM STORMWATER MANAGEMENT POLICY AS A RESULT OF IOWA SF455 LEGISLATION(PDF, 30KB)

Post Construction Stormwater Management Ordinance: Municipal Code Chapter 5B- AMENDED BY INTERIM POLICY ABOVE(PDF, 93KB)

Post Construction Ordinance Technical Guidance(PDF, 2MB)

Financial Security and Performance Bond(PDF, 19KB)

Post Construction As-Built Requirements(PDF, 194KB)

(PDF, 262KB)

Inspection and Maintenance

2025-Stormwater-Facility-Inspection-Report(PDF, 262KB)

Property owners of lots with stormwater management facilities are responsible for regular inspection and maintenance of the practices. Records are kept for a minimum of 3 years and provided to the city by request. The inspection report form template is provided in the link above. If the system in place is a proprietary system, contact the manufacturer for the inspection checklist for the specific system. The City of Ames does not have a preferred BMP vendor list for BMP inspections, maintenance and/or annual reporting.