Resource Recovery

Freel Drive Paving

The Freel Drive Paving project involves paving the remaining gravel-surfaced portion of Freel Drive to SE 5th Street. The current gravel street is unable to withstand the increase in traffic and the weight of the trucks required to operate the Resource Recovery and Recycling Campus (R3C).

Project UpdateFreel Drive Paving Map

 

Project Schedule

The paving will take place concurrently with the construction of the Resource Recovery and Recycling Campus. Construction for this project will be staged between the entrances of the R3C to allow the R3C site construction to occur without interruption.

 

Project Contacts

City of Ames Project Manager is Dean Sayre, he can be reached at 515-239-5277. 

City of Ames Inspector: Scott Miller, he can be reached at 515-203-0793.