When designing an ADU you may choose to either have a separate meter and utilities for the new building, or to connect it to existing services without having a separate meter. If a separate meter is installed the bill for the ADU can be separated from the primary home. If the utilities are shared, then only one bill is issued for the property.
The property owner will need to determine the feasibility of using existing services for a new ADU. If services are undersized, new or upgraded services may be required for the house and ADU. Alternatively, a wholly new service and meter may be beneficial depending on the location of the ADU on the property and the location of existing utilities.
No connection fee will be required for an ADU on a lot that has existing service. All other utility service and meter fees would apply.
Electric service is required to be provided underground to the new building.