City Hall and all other City facilities are closed to the public as a precaution against the spread of COVID-19. The closures will be effective after 5 p.m. Thursday, March 19, and will continue through May 15, 2020. City staff will continue to report to their offices and serve the public. Residents are encouraged to conduct City business online or by contacting individual City departments directly. Residents who are unsure how to conduct their City business may contact the City’s customer service hotline from 8 a.m. to 5 p.m. Monday through Friday at 515.239.5670.

North River Valley Low Head Dam Improvements Project

Print
Press Enter to show all options, press Tab go to next option

NRVP_Aerial Rendered_FINAL

 

The North River Valley Park Low Head Dam (NRV LHD) Improvements project has been in the works for several years.  Wanting to improve safety for those already using the area, many stakeholders and the City determined changes needed to be made to the NRV LHD area. 

The project is currently in the Construction Phase, working with the engineering firm of River Restoration of Carbondale, Colorado.  A construction contract was awarded to RW Excavating of Prairie City, Iowa, in April 2018. Elevated river levels delayed construction in 2018. Estimated project completion is now June 2019. 

The planned outcomes for the NRV LHD are:

  • Improved safety for recreational public via elimination of the recirculation hydraulics.
  • To maintain current water supply function of the impoundment (shallow well filtration) during drought conditions.
  • Improved fish passage and habitat
  • Improved water recreation feature for rafting, kayaking, etc.
  • Improved access for anglers and kayakers already using the park.

The City applied for and received several grants and donations to move forward on this project.  The following is a list of all current funding sources:

 Low Head Dam Safety Grant (2009) = $75,000 
 Low Head Dam Safety Grant (2016) = $85,000
 Low Head Dam Safety Grant (2017) = $112,901
 Water Trails Enhancement Grant (2017) = $120,000
Subtotal (Grant Monies) = $392,901

Water Utility Fund FY 13/14 CIP = $75,000
Water Utility Fund FY 16/17 CIP = $150,000
Parks System Improvements FY 15/16 CIP = $40,000
Local Option Sales Tax = $60,000
General Fund FY 16/17 = $150,000
Subtotal (City Funds) = $475,000

Iowa Whitewater Coalition - Confirmed = $1,000 
Hawkeye Fly Fishing Association - Confirmed = $1,000 
Outdoor Alliance of Story County = $1,000 
City of Ames Parks & recreation Staff (Tree Removal, Excavation Hauling) - Tentative = $75,000 
Subtotal (In-Kind Donations) = $117,000 

TOTAL FUNDING = $984,901

The Department of Natural Resources is also providing in kind assistance with construction inspections. 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer